#CodeRedTO takes your questions and finds answers! This month: Will EMS vehicles have the ability to travel at full speed down the transit right-of-way after the Sheppard East LRT is constructed? (is the curb height confirmed and location of curb cuts for EMS and Fire to access the ROW?)
We spoke to both the TTC and Metrolinx, and here’s their response:
EMS vehicles will have access to utilize the Sheppard East LRT ROW when needed. Speed limitations, curb heights and the location of curb cuts will be determined during the detailed design phase.
Got a question you can’t find the answer to? Email info@CodeRedTO.com or find us on Twitter at @CodeRedTO!